Customization: | Available |
---|---|
Movement Way: | Combined |
Atomization: | Rotary Atomization |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Description of Sawdust Dryer :
1.Drying is important before briquetting process.Technical parameter of dryer machine:
Model | Stove No. | Power (kw) | Capacity (kg/h) | Dimension(m) | Weight(kg) |
HGJ-I | One stove | 4 | 300-400 | 2.44*1.72*1.91 | 960 |
HGJ-II | One stove | 7.5+1.5+0.75 | 600-700 | 2.45*1.72*1.91 1.45*1.42*1.41 |
2280 |
HGJ-III | One stove | 11+1.5+0.75 | 800-900 | 2.45*1.72*1.91 1.45*1.42*1.41 |
2300 |
HGJ-IV | Two stoves | 5.5+1.5 | 300-400 | 2.44*1.23*1.9 1.4*1.3*1.4 |
1190 |
HGJ-V | Two stoves | 7.5+1.5 | 400-500 | 2.44*1.23*1.9 1.4*1.3*1.4 |
1600 |
HGJ-VI | Two stoves | 11+1.5+0.75 | 1000-1200 | 2.45*1.72*1.91 1.42*1.42*1.41 1.23*1.24*1.73 |
3080 |
HGJ-VII | Two stoves | 15+1.5+0.75 | 1100-1300 | 2.45*1.72*1.91 1.42*1.42*1.41 1.23*1.24*1.73 |
3090 |
Working principle of dryer machine:
The whole system consists of fan blower, motor engine, fuel boiler, steel pipe, cyclone and air lock. In this system, wet material is input into hopper by screw feeder. Fuel furnace produces large volume of hot air. The hot air is driven into steel pipes, mixed with wet sawdust and moved through curving pipes and drying chamber by the power of fan blower. Fast moving hot air sustains and is mixed with raw material sent by spiral feeder in the suspending state through the steel pipe; moisture evaporates as the material traverses along the steel pipe and is rendered dry at the discharge end. Humid air is continuously exhausted, thus the material is dried.FAQ:
1. What Is your raw material ?Our Service:
(1) Pre-sales service
a.Sales team will suggest suitable machine.
b.Technical team analyse and design.
a. Assist you build up factory and production line.
b. Install and maintain machines.
c. Training your workers to achieve skillful operation.
d. Offer technical support through telephone or online videos at any time.
a:T/T, L/C, Western Union
b: Usually, 50% payment in advance, 50% payment before delivery.
Our Factory & Sales Team & Service Team